Contract awardedAirfield pavements, runways and ground lighting

Lagan Airport Maintenance repairs and resurfaces the IWM Duxford runway

  • Imperial War Museums
  • East of England
  • Below threshold - without competition
  • 7 July 2026 to 4 September 2026

Imperial War Museums hired Lagan Airport Maintenance Limited to repair and resurface the hard runway at IWM Duxford.

The contract also covered the operational readiness platform, whose joints were to be cut away and repaired. Both jobs were needed so the surfaces stayed safe for continued use.

IWM awarded the £550,836 contract directly, without a competition, in June 2026. The work was due to end in September 2026.

What
Airfield pavements, runways and ground lighting
Value
£550,836
How it was bought
Below threshold - without competition
Dates and next
Jul 2026 to Sep 2026

How it was bought

2 official notices
  1. 4 Jun 2026Award noticeFind a Tender
  2. 4 Jun 2026Award noticeFind a Tender
  3. 7 Jul 2026Contract starts
  4. 4 Sep 2026Contract ends

How it compares

With every airfield pavements, runways and ground lighting award since 2021

Awards
25
Firms that won them
14
Median award
£7.07m
of 17 with a value
Typical length
10 months
In East of England
4 awards

Lagan Airport Maintenance Limited ranks 4th of 14 firms for airfield pavements, runways and ground lighting awards since 2021.

RankFirmAwardsValue
1Locked6£135.4m
2Locked2£75.9m
2Locked2·
4Locked1£46.7m
4Locked1£14.6m
4Locked1£7.07m
4Lagan Airport Maintenance Limited Won this one1£550,836
See who wins this work

Figures to 21 November 2026

Airfield pavements, runways and ground lighting at other buyers

Imperial War Museums has awarded 112 contracts since 2021.

See Imperial War Museums's page
  • Lagan Airport Maintenance Limited has won 1 public contract since 2021.