A417 Missing Link sheet piling at Grove Farm goes to Sheet Piling (UK)
- Kier Transportation
- South West
- Competitive procedure with negotiation (above threshold)
- 7 January 2025 to 24 April 2026
Kier Transportation hired Sheet Piling (UK) Limited as subcontractor for the sheet piling at Grove Farm on the A417 Missing Link at Air Balloon.
Kier was the principal contractor designing and building the scheme under the National Highways Limited Regional Delivery Partnership. The scheme was planned to add 3.4 miles (5.5km) of rural dual carriageway to the A417, joining the Brockworth bypass to the existing dual carriageway south of Cowley.
Kier awarded the £241,330 subcontract after a negotiated competition. It ran from January 2025 and was due to end in April 2026.
- What
- Piling and ground engineering
- Buyer
- Kier Transportation
- Supplier
- Sheet Piling (UK) Limited
- Value
- £241,330
- How it was bought
- Competitive procedure with negotiation (above threshold)
- Dates and next
- Jan 2025 to Apr 2026