Phase 1B East Quay: Kishorn Port plans a 150m quay at its dry dock
- Kishorn Port Limited
- Scotland
Kishorn Port Limited plans to appoint a contractor to build a 150m quay as Phase 1B of the Kishorn East Reclamation and Dry Dock Enlargement. The new East Quay would have a water depth of -12mCD. Its wall would be formed from sheet and combi piles anchored by tie rods, topped with precast concrete capping beams.
The contractor would build a piling bund from rock stockpiled in Phase 1, then remove it and reuse the material as fill behind the piles. Two mooring dolphins, piled and held with rock anchors, would be reached by steel walkway bridges.
The client's design team will design the works in full, and the contractor would act as Principal Contractor. The port plans to shortlist up to five firms and expected to go out to tender in September 2026. The works are estimated at £30m.
- What
- Harbour, marine and mooring works
- Buyer
- Kishorn Port Limited
- Estimated value
- £30m
- How it will be bought
- Not published
- Responses due
- Not published
- Contract dates
- Not published