Green Spine bridge assessment for LLDC goes to Buro Happold
- London Legacy Development Corporation
- London
- Below threshold - award under framework
- 26 October 2026 to 25 October 2028
London Legacy Development Corporation hired Buro Happold to assess the loading effect of planned public realm changes on two bridge structures, L03a and L03b. The changes are part of the Green Spine project, which brings more greenery and better links through Mandeville Place and the Belvedere.
The structural engineering work was awarded under a framework in October 2026 and runs for two years. The budget was around £50,000, but the framework's terms let the contract reach £150,000, which is the value of the award.
Contract ends October 2028
- What
- Bridge and structures inspection, assessment and design
- Supplier
- Buro Happold
- Value
- £150,000
- How it was bought
- Below threshold - award under framework
- Dates and next
- Oct 2026 to Oct 2028