Cullen Grummitt & Roe designs London Gateway's BoxBay empty superstack
- London Gateway Port Limited
- London
- Direct
- 29 October 2025 to 30 June 2028
London Gateway Port Limited hired Cullen Grummitt & Roe (UK) Ltd to engineer a BoxBay superstack for storing empty containers at London Gateway. The stack will sit between Berths 3 and 4, which are already working.
The design covers the stack's fire and electrical systems, its foundations and structure, its architecture and the civil works. Beyond the design, CGR will supervise the site during construction. The firm also carries out the topographic survey and helps with permits, early cost estimates and tender documents.
The £5.6m contract was awarded directly. It runs to June 2028 and can be extended to December 2028 if the work is delayed or its scope changes.
Contract ends June 2028
- What
- Multidisciplinary design team
- Supplier
- Cullen Grummitt & Roe (UK) LTD
- Value
- £5.6m
- How it was bought
- Direct
- Dates and next
- Oct 2025 to Jun 2028
- Option to Dec 2028