MGroup maintains London Underground's bridges and civil structures
- London Underground Limited
- London
- Competitive flexible procedure, 3 bids
- 7 April 2026 to 6 April 2031
MGroup maintains the bridges, tunnels and other civil structures of London Underground Limited, away from the track itself.
The Underground's portfolio includes over 4,100 deep tube tunnel assets and over 20,000 bridges and structures. The work mixes planned maintenance with fault response and reactive repairs. It includes repairs to brick tunnels, covered ways and girders, work on cable posts, stiles and draw pits, protective coatings and vegetation control. MGroup must also check each asset against its entry in Maximo, TfL's asset management system.
The technical and financial parts of the bid each counted for 40%, with HSQE and responsible procurement at 10% each. MGroup won after a competitive tender that drew three bids. The award was £99.2m in February 2026, and the five-year contract can run to April 2034 with an extension of up to three years.
Contract ends April 2031
- What
- Bridges and highway structures
- Supplier
- MGroup
- Value
- £99.2m
- How it was bought
- Competitive flexible procedure
- 3 bids
- Dates and next
- Apr 2026 to Apr 2031
- Option to Apr 2034