WH Scott & Son builds three crane cabs for LondonEnergy's EcoPark
- LondonEnergy Ltd
- London
- Open procedure
- 22 August 2026 to 31 December 2026
LondonEnergy Ltd has hired WH Scott & Son Engineers Ltd to replace three gantry crane operator cabs at its EcoPark Energy Centre in Edmonton. The centre burns about 500,000 tonnes of household waste a year in five boilers, fed from storage bunkers by three grab cranes.
The new cabs fix to the existing crane structure as direct replacements. Each cab has joystick controls, air conditioning, green-tinted safety glass and a 3 mm steel plate body insulated with 45 mm mineral wool. WH Scott also surveys the site, removes the old cabs, wires the new ones into the cranes and commissions them.
Quality counted for 60% of the score and price for 40% in the open tender. The contract was awarded in August 2026 at £300,000 and can run to June 2027 if the work calls for it.
Contract ends December 2026
- What
- Overhead cranes and lifting equipment
- Buyer
- LondonEnergy Ltd
- Supplier
- WH Scott & Son Engineers Ltd
- Value
- £300,000
- How it was bought
- Open procedure
- Dates and next
- Aug 2026 to Dec 2026
- Option to Jun 2027