Riverbank stabilisation at Withycombe, Minehead, for Magna Housing
- Magna Housing
- South West
- Below threshold - open competition
- 1 April 2027 to 31 August 2027
Magna Housing wants a contractor to stabilise and improve the riverbank beside 1-3 Buckhill in Withycombe, Minehead. Sections of the bank collapsed. The collapse has blocked the river channel, caused local flooding and disrupted the road beside it.
The aim is to restore water flow and stop further erosion, protecting nearby properties and infrastructure. Magna wants the work done in spring or summer 2027, when water levels tend to be lower, and finished before autumn. Disruption to the road will need managing.
Commercial terms count for 50% of the score, quality for 40% and social value for 10%. The work is estimated at £125,000. The deadline for bids is 29 January 2027.
Closes in 69 days· 29 Jan 2027
- What
- Retaining walls, slope stabilisation and land hazard works
- Buyer
- Magna Housing
- Estimated value
- £125,000
- How it is being bought
- Below threshold - open competition
- Bids due
- 29 Jan 2027
- Contract dates
- Apr 2027 to Aug 2027