Contract awardedWatercourse, culvert and ditch works

AGA Group Enviro-Fix wins Maidstone's Loose Stream weir repair

Maidstone Borough Council needed a five-metre-wide weir on Loose Stream repaired.

The council wanted a contractor that had worked on public open spaces and could take on repairs to hard landscaping as well as soft. The work had to follow the relevant law and any mitigation measures the site called for.

AGA Group Enviro-Fix Limited won the £49,124 contract from two bids. Work was due to run from September to October 2026.

What
Watercourse, culvert and ditch works
Value
£49,124
How it was bought
Limited
2 bids
Dates and next
Sep 2026 to Oct 2026

How it was bought

1 official notice
  1. 22 May 2026Award noticeFind a Tender
  2. 1 Sep 2026Contract starts
  3. 31 Oct 2026Contract ends

How it compares

With every watercourse, culvert and ditch works award since 2021

Half of awards fall between £52,582 and £249,504Median £113,551

Awards
329
Firms that won them
162
Median award
£113,551
of 305 with a value
This award
Smaller than 77%
of them
Typical length
4 months
In South East
55 awards

AGA Group Enviro-Fix Limited ranks 57th of 162 firms for watercourse, culvert and ditch works awards since 2021.

RankFirmAwardsValue
1Locked24£44.1m
2Locked17£4.55m
3Locked14£2.66m
4Locked11£10.8m
5Locked10£8.44m
6Locked8£1.22m
57AGA Group Enviro-Fix Limited Won this one1£49,124
See who wins this work

Figures to 25 November 2026

Watercourse, culvert and ditch works at other buyers

Maidstone Borough Council has awarded 66 contracts since 2021.

See Maidstone Borough Council's page
  • AGA Group Enviro-Fix Limited has won 17 public contracts since 2021.