WSP manages the South Mimms decarbonisation project for the MHRA
- Medicines and Healthcare products Regulatory Agency (MHRA)
- East of England
- Competitive quotation (below threshold)
- 1 September 2025 to 31 March 2028
The Medicines and Healthcare products Regulatory Agency (MHRA) hired WSP to design and manage the decarbonisation of its South Mimms site.
The site's carbon footprint stood at 5,000 tonnes, and the project has a Public Sector Decarbonisation Scheme grant. The gas boilers that make steam for autoclaves, freeze dryers and laboratory humidification are to be converted or replaced with electric ones. A new low temperature hot water network will heat the buildings, with steam and hot water made separately. WSP's bid proposed an energy centre with air source heat pumps, electric boilers and thermal storage.
WSP was chosen after a competition among suppliers on Crown Commercial Service's construction professional services framework (RM6165). The £2,770,000 contract runs from September 2025 to March 2028, when construction is due to finish.
Contract ends March 2028
- What
- Construction project management
- Supplier
- WSP
- Value
- £2.77m
- How it was bought
- Competitive quotation (below threshold)
- Dates and next
- Sep 2025 to Mar 2028