Electric steam boilers for the MHRA laboratories at South Mimms
- Medicines and Healthcare products Regulatory Agency (MHRA)
- East of England
- Open procedure
- 11 January 2027 to 10 April 2028
The Medicines and Healthcare products Regulatory Agency (MHRA) wants a contractor to replace the steam boilers at its laboratories in South Mimms, Hertfordshire. Under the South Mimms Electric Steam Boiler Project, three gas-fired boilers of 3,900 kg/h each give way to two electric boilers of 3,000 kg/h each.
The contractor would carry the job from detailed design through testing and commissioning to handover. It also covers the related building, civil, mechanical, electrical and controls work. The site is a live medical research facility, so steam supply, electrical resilience and controlled access must be kept up throughout.
Price counts for 30% of the score. Design and technical solution counts for 15% and social value for 10%. The work is estimated at £5,833,333. The deadline for bids is 20 November 2026, and the works run for 15 months.
Closed 20 Nov 2026
- What
- Industrial and process mechanical services
- Estimated value
- £5.83m
- How it is being bought
- Open procedure
- Bids due
- 20 Nov 2026
- Contract dates
- Jan 2027 to Apr 2028