MBDA studies Mk41 launcher integration with Aster 30 for the MoD
- Ministry of Defence
- South East
- Direct award
- 1 November 2026 to 31 August 2027
The Ministry of Defence (MoD) is paying MBDA to study whether the Aster 30 missile can be integrated with the Mk41 vertical launching system. MBDA will deliver a report on whether the combination is viable, covering engineering compatibility and how the combined system would perform.
The MoD awarded the study directly to MBDA in January 2026 at £1,666,667. A later award notice gives £1,860,855, with the work due to end in August 2027.
Contract ends August 2027
- What
- Defence technical and analytical consultancy
- Buyer
- Ministry of Defence
- Supplier
- MBDA
- Value
- £1.67m
- How it was bought
- Direct award
- Dates and next
- Nov 2026 to Aug 2027