Kier designs and builds fire safety improvements at HMP Nottingham
- Ministry of Justice
- East Midlands
- Call-off
- 6 February 2025 to 6 October 2028
The Ministry of Justice hired Kier to replace the fire alarm systems at HMP Nottingham with hard-wired technology. The works have to be finished by the end of January 2028.
The project also adds local UPS units as backup power for the misting systems on the landings. Kier designs the work first, with surveys and design at £903,854, and then builds it.
The ministry ordered the work through the MoJ Constructor Services Framework. The £13.4m award is the expected construction cost, and the contract runs to October 2028.
Contract ends October 2028
- What
- Fire detection and alarm systems
- Buyer
- Ministry of Justice
- Supplier
- Kier
- Value
- £13.4m
- How it was bought
- Call-off, MoJ Constructor Services Framework
- Dates and next
- Feb 2025 to Oct 2028