A38 Derby Junction design checked by Arcadis for National Highways
- National Highways
- East Midlands
- Call-off
- 27 January 2026 to 31 May 2026
National Highways hired Arcadis to check how mature the design for the A38 Derby Junction scheme was, ahead of its tender.
The work followed an earlier phase 1 gap analysis. Arcadis was to confirm that the 3D digital model showed the intended design. It was also to report how complete the Stage 5 design packages were and whether they had been approved. The final report was to cover design risks, value engineering ideas, and the carbon and biodiversity position, along with an update on Arcadis's own work since November 2024. The aim was to show where National Highways could reduce design risk before and during procurement.
The work was ordered through SPaTS3, the Specialist Professional and Technical Service 3 framework run by National Highways. The £452,132 contract was due to run from January to May 2026.
- What
- Highway and traffic engineering design
- Buyer
- National Highways
- Supplier
- Arcadis
- Value
- £452,132
- How it was bought
- Call-off, SPaTS3
- Dates and next
- Jan 2026 to May 2026