M60 Barton High Level Bridge bearing checks go to AtkinsRealis Jacobs JV
- National Highways
- North West
- Call-off from a framework agreement
- 2 July 2026 to 31 March 2029
National Highways appointed the AtkinsRealis Jacobs Joint Venture to check design work for adjusting the bearings on the M60 Barton High Level Bridge.
The joint venture carries out Category 3 checks on the Approval in Principle for the substructure and reviews the ground investigation surveys.
The bridge carries the M60 across the Manchester Ship Canal on eighteen spans. It was built in 1960 and widened between 1986 and 1989. Because the original concrete showed slight alkali-aggregate reactivity, the new outer supports were built as free-standing columns on their own piles. Link-and-pin bearings tie them to the old piers, and these need periodic adjustment to manage movement between the two. The £272,959 contract runs to March 2029.
Contract ends March 2029
- What
- Bridge and structures inspection, assessment and design
- Buyer
- National Highways
- Value
- £272,959
- How it was bought
- Call-off from a framework agreement
- Dates and next
- Jul 2026 to Mar 2029