Amey looks after National Highways' pavement friction testing kit
- National Highways
- Call-off
- 25 February 2026 to 31 March 2029
National Highways has hired Amey to look after and run its specialist equipment for measuring the grip of road surfaces. Among the devices are the Skid Resistance Development Platform (SkReDeP), a GripTester and the Wehner Schulze Friction After Polishing device. Replacing the whole set would cost an estimated £1.5m.
Amey keeps the devices calibrated, stored securely and ready for use. It runs them to collect data that supports the CS 228 and CD 236 standards and innovation in areas such as surfacing materials. Amey also advises National Highways on using the tools, and may develop, buy or dispose of equipment as needed.
National Highways ordered the work through its Specialist Professional and Technical Service 3 (SPaTS3) framework in February 2026. The £290,881 contract runs to March 2029.
Contract ends March 2029
- What
- Highway condition surveys
- Buyer
- National Highways
- Supplier
- Amey
- Value
- £290,881
- How it was bought
- Call-off, SPaTS3
- Dates and next
- Feb 2026 to Mar 2029