Fibre backbone for the National Library of Wales in Aberystwyth
The National Library of Wales wants a supplier to install a fibre backbone across its site in Aberystwyth. The link, which the library calls a Superhighway, would join its three datacentres, with runs estimated at 150m, 200m and 300m.
The library wants one supplier for both phases. Phase 1 is the planned backbone installation, with a proposal due alongside each bid. Phase 2 is a call-off for installation work at daily and hourly rates, linking up to 30 network cabinets with 2 runs each. Rates must hold until 31 July 2028. The work takes place in CADW listed buildings, and a site visit before bidding is mandatory. Bidders must hold Cyber Essentials and ISO27001.
The library has published no estimate. The deadline for bids is 26 November 2026, and the contract runs for 18 months.
Closes in 4 days· 26 Nov 2026
- What
- Structured cabling
- Estimated value
- Not published
- How it is being bought
- Not published
- Bids due
- 26 Nov 2026
- Contract dates
- Not published