Contract awardedLocal exhaust ventilation and fume extraction
LEV system at National Maritime Museum replaced by McDonald Brown
- National Maritime Museum
- London
- Limited
- 19 January 2026 to 27 March 2026
The National Maritime Museum hired McDonald Brown Ltd to replace its local exhaust ventilation (LEV) system.
McDonald Brown was to take out the existing extract system and put in a replacement, with new ductwork as part of the job.
The award was £74,642, and the work was due to run from January to March 2026.
- What
- Local exhaust ventilation and fume extraction
- Supplier
- McDonald Brown Ltd
- Value
- £74,642
- How it was bought
- Limited
- Dates and next
- Jan 2026 to Mar 2026