108 kWp solar PV design for National Mining Museum Scotland
- National Mining Museum Scotland
- Scotland
- Open procedure
- 14 December 2026 to 5 March 2027
National Mining Museum Scotland wants a multidisciplinary design team for a proposed 108 kWp ground-mounted solar PV array at Lady Victoria Colliery. The colliery is in Newtongrange, Midlothian, and the team would take the design to RIBA Stage 4. The array is the first phase of the museum's Energy Development Plan, funded by the Community and Renewable Energy Scheme (CARES).
The team would handle heritage matters and statutory approvals as well as the PV, electrical and foundation design. It would also survey underground services, plan costs and prepare the documents for buying the construction work. Building the array is not part of the commission.
The museum has gone out to tender, and the commission is estimated at £57,547 excluding VAT. The deadline for bids is 7 December 2026, and the appointment runs to March 2027.
Closes in 11 days· 7 Dec 2026
- What
- Multidisciplinary design team
- Estimated value
- £57,547
- How it is being bought
- Open procedure
- Bids due
- 7 Dec 2026
- Contract dates
- Dec 2026 to Mar 2027