Contract awardedWatercourse, culvert and ditch works

Stodmarsh ditch restoration for Natural England goes to FGS Pilcher

  • Natural England
  • South East
  • Below threshold - open competition
  • 14 September 2026 to 17 November 2026

Natural England hired FGS Pilcher to restore historic "lost" ditches at Stodmarsh National Nature Reserve in Kent, with new bunds and culverts.

The excavators work in reedbeds where ground conditions are poorly understood. Areas of soft silt there run deeper than 2m and are sometimes too soft even for low ground pressure machines. Ditch edges are lowered from 1.50m to 1.00m AOD and sloped gently back into the reedbed. Suitable spoil builds dry tracking bunds with a crest at least 4m wide.

Natural England supplies 600mm plastic culvert pipes for the contractor to lay at ditch crossings. Quotes were scored 60% on price and 40% on quality, and a site visit was compulsory. FGS Pilcher took the £49,950 contract in September 2026, with the work due to finish in November 2026.

What
Watercourse, culvert and ditch works
Supplier
FGS Pilcher
Value
£49,950
How it was bought
Below threshold - open competition
Dates and next
Sep 2026 to Nov 2026

How it was bought

3 official notices
  1. 7 Jul 2026Tender noticeFind a Tender
  2. 10 Jul 2026Tender re-issuedFind a Tender
  3. 14 Aug 2026Bids closed
  4. 10 Sep 2026Award noticeFind a Tender
  5. 14 Sep 2026Contract starts
  6. 17 Nov 2026Contract ends

Natural England has bought this 10 times since 2021

Last bought
Sep 2026
Typical length
3 months
Typical value
£19,278
Suppliers used
9
AwardedContractWon byValue
Sep 2026This purchase2 monthsFGS Pilcher£49,950
Jul 2026Locked4 monthsLocked£48,400
Jul 2026Locked3 monthsLocked£12,200
Oct 2025Locked1 monthLocked£19,656
Sep 2025Locked2 monthsLocked£21,033

and 5 more

Suppliers Natural England has used

SupplierContractsValue
Locked2£27,173
FGS Pilcher Won this one1£49,950
Locked1£48,400
Locked1£27,600
Locked1£19,656

and 4 more

See the contracts and who won them

Figures to 21 November 2026

How it compares

With every watercourse, culvert and ditch works award since 2021

Half of awards fall between £52,582 and £249,504Median £113,551

Awards
329
Firms that won them
162
Median award
£113,551
of 305 with a value
This award
Smaller than 77%
of them
Typical length
4 months
In South East
55 awards

FGS Pilcher ranks 57th of 162 firms for watercourse, culvert and ditch works awards since 2021.

RankFirmAwardsValue
1Locked24£44.1m
2Locked17£4.55m
3Locked14£2.66m
4Locked11£10.8m
5Locked10£8.44m
6Locked8£1.22m
57FGS Pilcher Won this one1£49,950
See who wins this work

Watercourse, culvert and ditch works at other buyers

Natural England has awarded 1,087 contracts since 2021.

See Natural England's page
  • FGS Pilcher has won 4 public contracts since 2021, 3 of them from Natural England.

    • Sep 2026This purchase£49,950
    • Dec 2025Locked£31,150
    • Jul 2025Locked£46,220
    See the contracts