Osteology Store refurbishment for the Natural History Museum
- Natural History Museum
- London
- Below threshold - open competition
- 1 April 2027 to 30 September 2027
The Natural History Museum wants a principal contractor to refurbish the Osteology Store in the basement of its Grade I listed Waterhouse Building. The store will serve first as a temporary "Logistics Hub", then as a permanent store for heavy and large specimens from the museum's South London Store.
The contractor would design, to Stage 4, and install new building services, including HVAC, fire alarm and security systems. It would also build a security lobby with a powered door, add secondary glazing on three north-facing windows and remove raised floors and non-original partitions.
Relevant experience carries 45% of the score, managing specialist teams 20%, logistics 20% and programme 15%. The museum first estimated the work at £1m and later raised the estimate to £1.2m. The deadline for bids is 25 November 2026.
Closes in 4 days· 25 Nov 2026
- What
- Interior fit-out and office reconfiguration
- Estimated value
- £1m
- How it is being bought
- Below threshold - open competition
- Bids due
- 25 Nov 2026
- Contract dates
- Apr 2027 to Sep 2027