Abatement system tackles emissions from NCC's new carbon fibre line
- NCC Operations Limited
- South West
- Open, 3 bids
- 20 November 2025 to 19 November 2030
NCC Operations Limited bought an abatement system from Environmental Integrated Solutions to control the gases a new carbon fibre line sends into the air.
The line runs tow of up to 50k. The supplier provides the system and must also install and commission it. Quality carried 60% of the score and price 40%, and the open tender drew three bids.
The £380,000 contract runs from November 2025 to November 2030.
Contract ends November 2030
- What
- Local exhaust ventilation and fume extraction
- Value
- £380,000
- How it was bought
- Open
- 3 bids
- Dates and next
- Nov 2025 to Nov 2030