Contract awardedModular and portable buildings

Springfield Steel Buildings supplies two prefabricated steel buildings

Net Zero Technology Centre Limited is buying two pre-fabricated steel buildings from Springfield Steel Buildings. The supplier will deliver both structures to the designated site and assemble them in full there.

The open tender drew one bid. The £155,000 contract was awarded in November 2026 and is set to run for two months.

What
Modular and portable buildings
Value
£155,000
How it was bought
Open procedure
1 bid
Dates and next
10 Nov 2026

How it was bought

2 official notices
  1. 23 Jan 2026Tender noticePublic Contracts Scotland
  2. 30 Jan 2026Bids closed1 bid
  3. 10 Nov 2026Award noticePublic Contracts Scotland

How it compares

With every modular and portable buildings award since 2021

Half of awards fall between £98,047 and £811,975Median £281,304

Awards
818
Firms that won them
286
Median award
£281,304
of 777 with a value
This award
Smaller than 65%
of them
Typical length
6 months
In Scotland
77 awards

Springfield Steel Buildings ranks 96th of 286 firms for modular and portable buildings awards since 2021.

RankFirmAwardsValue
1Locked155£164m
2Locked38£30.8m
3Locked24£206.3m
4Locked21£54.5m
5Locked18£16.5m
6Locked17£8.42m
96Springfield Steel Buildings Won this one1£155,000
See who wins this work

Figures to 21 November 2026

Modular and portable buildings at other buyers

Net Zero Technology Centre Limited has awarded 58 contracts since 2021.

  • Springfield Steel Buildings has won 1 public contract since 2021.

4 modular and portable buildings tenders are open now

See them
More modular and portable buildings contracts awarded in 2026