Long switch wagon modules: Network Rail plans design and build
- Network Rail Infrastructure Limited
- London
- 1 November 2027 to 31 October 2028
Network Rail Infrastructure Limited plans to buy wagon modules that can carry long switches. The supplier would design and build interchangeable modules for the 4 existing WASCOSA FEA-W wagons, which are container flat wagons.
The modules must carry switches from 25m to 75m long, the 'G' to 'J' sizes. Network Rail will not alter the base wagons, which also take modules for track panels, sleepers and rail.
Network Rail has asked suppliers for their views before any tender, with responses due by 20 November 2026. The work is marked as suitable for small businesses and voluntary, community and social enterprises. The purchase is estimated at £1,039,224, for a 12-month contract from November 2027.
- What
- On-track plant and engineering trains
- Estimated value
- £1.04m
- How it will be bought
- Not published
- Responses due
- 20 Nov 2026
- Contract dates
- Nov 2027 to Oct 2028