Long-welded rail trains: Network Rail plans a new fleet
- Network Rail Infrastructure Limited
- London
- Competitive flexible procedure
- 1 July 2028 to 2 July 2028
Network Rail plans to buy a new fleet of long-welded rail trains, as its existing fleet nears replacement. It expects about 8 + 3 trains. Each would be hauled by a locomotive, carry at least 24 rails, and both deliver and recover rail. Remotely operated handling equipment would cut manual work and improve safety.
The wagons and the material handling equipment would be bought separately. The equipment would be designed and built as a modular kit, then fitted to UK-approved wagons. Network Rail has also asked wagon makers about their capability, capacity and solutions for the wagon part of the fleet, with replies due by 24 November 2026.
The purchase is estimated at £130m.
Due in 2 days· 24 Nov 2026
- What
- On-track plant and engineering trains
- Estimated value
- £130m
- How it will be bought
- Competitive flexible procedure
- Responses due
- 24 Nov 2026
- Contract dates
- Jul 2028 to Jul 2028