Tender closedOn-track plant and engineering trains

Rail haulage and distribution centres: Network Rail goes out to tender

Network Rail Infrastructure Limited has gone out to tender for the rail haulage and depot work behind its materials trains. The work covers five Local Distribution Centres and the trains that serve them.

Lot 1 is the running of the centres at Bescot, Carlisle Kingmoor, Eastleigh, Millerhill and Whitemoor, including shunting and marshalling wagons. Lot 1b covers Network Services, timetabled haulage between the centres and material suppliers across 25 route bundles. Lot 2 covers Possession Services. Trains also run from the centres to railway worksites when needed.

Price counts for 70% of the score and technical quality for 30%, covering mobilisation, safety, capacity and sustainability. The deadline for bids is 18 November 2026. The purchase is estimated at £949.9m and can run to March 2036 with a one-year extension.

Closed 18 Nov 2026

What
On-track plant and engineering trains
3 lots
Estimated value
£949.9m
How it is being bought
Competitive flexible procedure
Bids due
18 Nov 2026
Contract dates
Apr 2028 to Mar 2035
Option to Mar 2036

Lots

3 lots
LotWhatEstimated value
Lot 1Operation of Network Rail’s Local Distribution Centres (LDCs)·
Lot 1bOperation of Network Services·
Lot 2Operation of Possession Services·

How it is being bought

2 official notices
  1. 28 May 2026Planning noticeRead full notice
  2. 30 Sep 2026Tender noticeRead full notice
  3. 18 Nov 2026Bids closed
  4. 1 Apr 2028Contract starts
  5. 31 Mar 2035Contract endsUp to Mar 2036 with extension

Network Rail Infrastructure Limited has bought this 12 or more times since 2021

Last bought
Aug 2026
Typical length
4 years
Typical value
£6.15m
Suppliers used
13
in its last 12 purchases
AwardedContractWon byValue
Aug 2026Locked2.5 yearsLocked£2.55m
Jun 2026Locked5 yearsLocked£784,714
May 2026Locked5 yearsLocked£1.44m
Apr 2026Locked4 yearsLocked£12.5m
Jan 2026Locked3 yearsLocked£1.69m

and at least 7 more

Suppliers Network Rail Infrastructure Limited has used in its last 12 purchases

SupplierContractsValue
Locked4·
Locked1£12.5m
Locked1£3.83m
Locked1£784,714
Locked1·

and 8 more

See the contracts and who won them

Figures to 21 November 2026

How it compares

With every on-track plant and engineering trains award since 2021

Half of awards fall between £734,720 and £4.39mMedian £1.5m

Awards
51
Firms that won them
34
Median award
£1.5m
of 39 with a value
This tender's estimate
Bigger than 100%
of them
Typical length
2 years
In London
18 awards

34 firms have won on-track plant and engineering trains awards since 2021.

RankFirmAwardsValue
1Locked5£440.5m
2Locked4£2.97m
3Locked3£13.3m
4Locked2£198.8m
4Locked2£104.8m
4Locked2£3.83m
See who wins this work

On-track plant and engineering trains at other buyers

Network Rail Infrastructure Limited has awarded 274 contracts since 2021.

See Network Rail Infrastructure Limited's page

Similar on-track plant and engineering trains contracts and prices

51 on-track plant and engineering trains contracts were awarded since 2021, 18 of them in London. See who won them and what they went for, next to this one.

See who won them