AMTEC building design at New College Durham goes to Ryder Architecture
- New College Durham
- North East
- 10190)
- 5 October 2026 to 31 March 2027
New College Durham appointed Ryder Architecture as lead consultant for its new AMTEC building. The commission includes architectural design and technical advice, with fire safety, electrical and mechanical design as well, up to RIBA Stage 3.
The college awarded the £225,000 contract directly under Lot 1 of an NHS SBS framework in September 2026. The work is due to end in March 2027.
Contract ends March 2027
- What
- Multidisciplinary design team
- Buyer
- New College Durham
- Supplier
- Ryder Architecture Limited
- Value
- £225,000
- How it was bought
- 10190)
- Dates and next
- Oct 2026 to Mar 2027