OCS takes on de-steaming at NHS Lothian's Western General Hospital
- NHS Lothian
- Scotland
- Restricted procedure, 2 bids
NHS Lothian hired OCS to deliver phase 3 of the energy infrastructure work at the Western General Hospital, known as De-Steaming.
The work replaces the North steam leg across the campus with a new Low Temperature Hot Water network. Heat interface equipment inside several existing buildings is replaced too. OCS is engaged as primary contractor on a two-stage design and build contract.
There were two bids. Technical quality counted for 70% of the score, price for 20% and social value for 10%. The £652,029 contract was awarded in July 2026.
- What
- Heat networks and district heating
- 2 of 2 lots awarded
- Buyer
- NHS Lothian
- Supplier
- OCS
- Value
- £652,029
- Across 2 lots
- How it was bought
- Restricted procedure
- 2 bids
- Dates and next
- 21 Jul 2026