Sarner designs and builds the Boathouse 6 exhibitions for the NMRN
- National Museum of the Royal Navy
- South East
- Open, 2 bids
- 23 May 2025 to 29 June 2026
The National Museum of the Royal Navy (NMRN) hired Sarner International Limited to design and build the exhibitions in Boathouse 6.
Sarner was to develop the existing RIBA Stage 3 designs to Stage 4 and then build the spaces through to RIBA Stage 7. The first floor was to take a temporary exhibition space and the ground floor a permanent exhibition, along with the circulation space around them. The designers of the Stage 3 work stayed with the museum as its design monitor rather than moving to Sarner. Opening was planned for June 2026.
Two bids came in after an open tender. Quality made up the whole score, and bids were then ranked on price per quality point. The award was £3.7m, a little above the £3.3m estimate, and the contract was due to end in June 2026.
- What
- Museum exhibition fit-out, exhibits and mounts
- Supplier
- Sarner International Limited
- Value
- £3.75m
- How it was bought
- Open
- 2 bids
- Dates and next