MKG Building Services fits new plant in the NOCS Energy Centre
- National Oceanography Centre
- South East
- Below threshold - limited competition
- 12 October 2026 to 6 November 2026
The National Oceanography Centre hired MKG Building Services Limited, a small business, to replace three plant items in the NOCS Energy Centre.
Each served the site's heating, cooling or seawater systems, and each had passed or was nearing the end of its working life. One was the seawater boll filter. On level 4, the chilled water system needed a new pressurisation unit and expansion vessel. On the ground floor, the low temperature hot water (LTHW) system needed a new deaerator.
MKG was to remove the old plant, install and commission the new, and handle the mechanical, electrical and controls work needed to make it run. The £38,391 contract was let after a limited competition in September 2026. The work was due to end in November 2026.
- What
- Combined M&E building services installation
- Supplier
- MKG Building Services Limited
- Value
- £38,391
- How it was bought
- Below threshold - limited competition
- Dates and next
- Oct 2026 to Nov 2026