Sewage pump replacement at NOC Southampton goes to Drainex
- National Oceanography Centre
- South East
- Below threshold - limited competition
- 20 July 2026 to 14 August 2026
The National Oceanography Centre hired Drainex Environmental Solutions Limited to replace the sewage pit pumps at its Southampton site.
The aim was a more reliable system that needed less upkeep. Drainex was to take out the old pumps, fit two submersible Flyte pump units of about 3.1kW, and design, test and commission the new system.
The centre awarded the £29,990 contract after a limited competition in July 2026, and the work was due to end in August 2026.
- What
- Pumps and booster sets
- Value
- £29,990
- How it was bought
- Below threshold - limited competition
- Dates and next
- Jul 2026 to Aug 2026