River Irvine active travel route goes to Bottom Groundworks
- North Ayrshire Council
- Scotland
- Open procedure, 13 bids
- 1 June 2026 to 31 May 2027
North Ayrshire Council commissioned a 2.42km active travel route along the River Irvine. The shared-use path is 3 metres wide and mostly follows the river's northern bank.
It runs from the roundabout at Riverside Way and Long Drive to the B730, south of the A71 underpass. A 12-month defects liability period follows the build.
Bottom Groundworks won the £999,923 contract after an open tender that drew 13 bids. The work was planned to run from June 2026 to May 2027.
Contract ends May 2027
- What
- Footways, cycleways and path construction
- Supplier
- Bottom Groundworks
- Value
- £999,923
- How it was bought
- Open procedure
- 13 bids
- Dates and next
- Jun 2026 to May 2027