Area 6 Drainage works for North Yorkshire Council go to C R Reynolds
- North Yorkshire Council
- Yorkshire and the Humber
- Restricted procedure
- 1 October 2025 to 6 February 2026
North Yorkshire Council hired C R Reynolds Limited to carry out six drainage schemes in its Area 6.
At Ripon Road, Wormald Green, a 150mm carrier pipe was to be replaced with a 225mm one, with two new 150mm drain pipes connected to it. Low Green Darley and York Road each needed a 150mm drain pipe replaced and the carriageway and footway rebuilt. Other schemes covered ditch clearance on the A59 Skipton Road, drainage grips on Shaw Lane and resurfacing on Weeton Lane.
C R Reynolds, a small business, was chosen after a restricted tender. The £683,482 contract ran from October 2025 and was due to end in February 2026.
- What
- Highway drainage and gully cleansing
- Supplier
- C R Reynolds Limited
- Value
- £683,482
- How it was bought
- Restricted procedure
- Dates and next
- Oct 2025 to Feb 2026