Adrian Morrison & Son installs a 12m bridleway bridge at Little Ribston
- North Yorkshire Council
- Yorkshire and the Humber
- Below threshold - limited competition
- 5 October 2026 to 23 October 2026
North Yorkshire Council had the bridleway bridge at Little Ribston and North Deighton replaced with a 12m kit bridge.
The work covered new abutments from precast concrete blocks, a temporary cofferdam the contractor was to design, and clearing what was left of the old bridge's footings.
Adrian Morrison & Son was awarded the £37,225 contract after a limited competition in September 2026. The works were due to finish in October 2026.
- What
- Bridges and highway structures
- Supplier
- Adrian Morrison & Son
- Value
- £37,225
- How it was bought
- Below threshold - limited competition
- Dates and next
- Oct 2026 to Oct 2026