Oban buoy store tearoom conversion for the Northern Lighthouse Board
- Northern Lighthouse Board
- Scotland
- Below threshold - open competition
- 4 January 2027 to 31 March 2027
The Northern Lighthouse Board wants a contractor to turn a mezzanine attic in the Buoy Store at its Oban base into a tearoom. The space sits above a small tools workshop. The floor must be strengthened with new timber joists and steelwork, and the workshop gets a fire-rated ceiling. The contractor would design, make and fit an external stairway reaching a new first-floor door.
Fitting out covers kitchen units with a sink, plumbing, extract ventilation, and electrics with data and fire detection. All work must meet the Building (Scotland) Regulations 2004, and the depot stays in operation throughout. A site visit on 17 November 2026 is mandatory.
The deadline for bids is 30 November 2026. The three-month job is estimated at £200,000.
Closes in 8 days· 30 Nov 2026
- What
- Building extensions, alterations and minor works
- Estimated value
- £200,000
- How it is being bought
- Below threshold - open competition
- Bids due
- 30 Nov 2026
- Contract dates
- Jan 2027 to Mar 2027