Allerton OHLE isolations for Northern Trains go to Aureos
- Northern Trains Limited
- Yorkshire and the Humber
- Limited
- 26 March 2026 to 2 September 2026
Northern Trains Limited hired Aureos to motorise the overhead line isolators in the maintenance shed at its Allerton Train Care Centre.
Depot staff needed a fast, safe way to isolate the overhead line on roads 1 to 3 when working at height on trains in the shed. Aureos was to design the change, then swap the manual gear on the existing MLE 1250A isolators for motor units on new steelwork.
As well as building the works, Aureos was the principal designer, liaising with the Depot Protection System specialist and Network Rail. Northern Trains awarded the £240,527 contract in March 2026. With its extension option, the work could have run to November 2026.
- What
- Rail electrification and signalling
- Supplier
- Aureos
- Value
- £240,527
- How it was bought
- Limited
- Dates and next
- Mar 2026 to Sep 2026
- Option to Nov 2026