Workshop-to-loft structured cabling at NPL comes from Kinetic IT
- National Physical Laboratory
- London
- Below threshold - unknown
- 9 July 2026 to 9 July 2026
Kinetic IT Limited installed structured cabling to connect a ground floor workshop at the National Physical Laboratory (NPL) to the network. The new links joined the workshop to a loft space and to communications equipment on the first floor.
Kinetic IT also supplied data racks and power supplies, and tested and certified the finished network. The £3.8m contract started in July 2026.
- What
- Structured cabling
- Supplier
- Kinetic IT Limited
- Value
- £3.8m
- How it was bought
- Below threshold - unknown
- Dates and next
- Jul 2026 to Jul 2026