Hinkley Point B engineering and boiler integrity work goes to Altrad
- Nuclear Restoration Services
- North West
- Direct award
- 1 October 2026 to 30 September 2027
Nuclear Restoration Services awarded Altrad a contract for site delivery, engineering services and boiler asset integrity management at Hinkley Point B. The contract came to Nuclear Restoration Services by novation from EDF.
Altrad's work is one segment of support for the site's Advanced Gas-cooled Reactor boilers. It covers technical engineering and maintenance management aimed at keeping the boilers safe and compliant with regulation.
The contract was awarded directly in May 2026 at £3.3m. That figure assumes the longest possible term, so it is not guaranteed spend. With its optional extra year, the contract could run to September 2028.
Contract ends September 2027
- What
- Nuclear technical support, engineering and safety
- Supplier
- Altrad
- Value
- £3.3m
- How it was bought
- Direct award
- Dates and next
- Oct 2026 to Sep 2027
- Option to Sep 2028