Contract awardedAsbestos management and consultancy

RVA Engineering studies asbestos removal in Wylfa's Turbine Hall

Nuclear Restoration Services hired RVA Engineering Solutions Limited to study how asbestos could be removed from the Turbine Hall at Wylfa.

The feasibility study assessed the hazards particular to the site and the engineering the removal would need. Its findings were to inform plans for decommissioning the facility. The work formed part of Strategic Enablers.

The £21,500 contract was awarded directly, without a competition, and was due to end in March 2026.

What
Asbestos management and consultancy
Value
£21,500
How it was bought
Direct
Dates and next
Jan 2026 to Mar 2026

How it was bought

1 official notice
  1. 7 Jan 2026Award noticeFind a Tender
  2. 8 Jan 2026Contract starts
  3. 31 Mar 2026Contract ends

How it compares

With every asbestos management and consultancy award since 2021

Half of awards fall between £60,000 and £487,250Median £152,754

Awards
213
Firms that won them
78
Median award
£152,754
of 208 with a value
This award
Smaller than 93%
of them
Typical length
2 years
In North West
28 awards

RVA Engineering Solutions Limited ranks 40th of 78 firms for asbestos management and consultancy awards since 2021.

RankFirmAwardsValue
1Locked29£16.4m
2Locked15£3.82m
3Locked14£3.36m
4Locked11£8.52m
5Locked10£2.86m
6Locked8£604,423
40RVA Engineering Solutions Limited Won this one1£21,500
See who wins this work

Figures to 21 November 2026

Asbestos management and consultancy at other buyers

Nuclear Restoration Services has awarded 1,283 contracts since 2021.

See Nuclear Restoration Services's page
  • RVA Engineering Solutions Limited has won 2 public contracts since 2021, 2 of them from Nuclear Restoration Services.

    • Oct 2026Locked£23,701
    • Jan 2026This purchase£21,500
    See the contracts

2 asbestos management and consultancy tenders are open now

See them
More asbestos management and consultancy contracts awarded in 2026