Baringa models three network charging reform options for Ofgem
- Ofgem
- Open procedure
- 23 July 2026 to 30 September 2026
Ofgem hired Baringa to review and model three of its remaining options for reforming network charges. The three were the Network Utilisation Impact Charge, the System and Constraints Impact Charge, and Auctions.
Ofgem had set out the options in a call for input and wanted to narrow them to a shortlist later in the year. The review was also meant to feed into DESNZ's Reformed National Pricing work, which looks at other levers for delivering the Strategic Spatial Energy Plan.
The £99,000 contract was awarded in July 2026 after an open tender and was due to end in September 2026.