Gosport South Jetty Head design: Oil and Pipelines Agency plans a tender
- Oil and Pipelines Agency
- South East
- Open procedure
- 1 July 2027 to 30 June 2028
The Oil and Pipelines Agency plans to buy the design of marine construction works at the South Jetty Head in Gosport. The design is part of the agency's Gosport Jetty AMP project and covers both engineering and construction works.
The agency plans an open procedure for the tender. The design is estimated at £2m, and the contract would run from July 2027 to June 2028.
- What
- Bridge and structures inspection, assessment and design
- Estimated value
- £2m
- How it will be bought
- Open procedure
- Responses due
- Not published
- Contract dates
- Jul 2027 to Jun 2028