Marlborough House rebuild's M&E engineering goes to Expedite
- Plymouth Community Homes
- South West
- Open
- 23 February 2026 to 17 February 2031
Plymouth Community Homes (PCH) chose Expedite Building Services as mechanical and electrical (M&E) engineers for the rebuild of Marlborough House.
The PCH board has approved replacing the 13-storey block of 121 flats with 148 new flats for social rent, under an estimated £41.7m build contract.
The M&E role was one of seven lots for the consultant team, alongside an employer's agent, a lead design architect and a fire engineer. The £75,500 lot was awarded in February 2026 after an open tender, on a five-year contract to February 2031.
Contract ends February 2031
- What
- Architectural design services
- 1 of 7 lots awarded
- Value
- £75,500
- Across 1 lots
- How it was bought
- Open
- Dates and next
- Feb 2026 to Feb 2031