Re-Gen (UK) Construction builds backup power for Pirbright's CVIM building
- The Pirbright Institute
- South East
- Below threshold - open competition
- 11 May 2026 to 8 August 2026
The Pirbright Institute hired Re-Gen (UK) Construction, a small business, to design and build emergency backup power for its CVIM building. The aim was to keep vaccine batch production and science running in the building if the whole site lost mains power.
The building draws its main supply from the T8 substation. The job centred on a standalone 510kVA generator with an automatic transfer switch. The contractor was to lay a concrete pad of about 6m by 3m beside the Jenner Building's generator. The work also covered a link to the existing diesel tank and alarms to the BACS control room.
The institute awarded the £107,334 contract after an open competition, and the work was due to end in August 2026.
- What
- Standby generators and UPS
- Supplier
- Re-Gen (UK) Construction
- Value
- £107,334
- How it was bought
- Below threshold - open competition
- Dates and next
- May 2026 to Aug 2026