Allianz wins Poplar HARCA's engineering inspection and insurance cover
- Poplar HARCA
- London
- Below threshold - limited competition, 3 bids
- 7 July 2026 to 13 June 2027
Poplar HARCA needed statutory engineering inspections for its plant and equipment, along with the engineering insurance cover that goes with them. Allianz has to deliver the service in line with the insurer's policy terms and the regulations, keeping Poplar HARCA within its statutory inspection duties.
Allianz won the contract in June 2026 after a limited competition that drew three bids. The award was £86,994 for one year of cover to June 2027.
Contract ends June 2027
- What
- Engineering insurance inspection (LOLER and PSSR)
- Buyer
- Poplar HARCA
- Supplier
- Allianz
- Value
- £86,994
- How it was bought
- Below threshold - limited competition
- 3 bids
- Dates and next
- Jul 2026 to Jun 2027