Contract awardedInterior fit-out and office reconfiguration

Brecon dental suite refit for Powys goes to S R Building Solutions

Powys Teaching Local Health Board hired S R Building Solutions Limited to redesign and refurbish the existing dental suite in Brecon. The dental department has improved its ways of working, and the room was to be redesigned to suit them. The aim is a suite that is easier to use and to move through.

The lowest price was set to win. One bid came in, and S R Building Solutions took the £32,045 contract in October 2026.

What
Interior fit-out and office reconfiguration
Value
£32,045
How it was bought
Not published
1 bid
Dates and next
15 Oct 2026

How it was bought

1 official notice
  1. 15 Oct 2026Award noticeFind a Tender

How it compares

With every interior fit-out and office reconfiguration award since 2021

Half of awards fall between £56,932 and £383,448Median £134,575

Awards
1,935
Firms that won them
905
Median award
£134,575
of 1,851 with a value
This award
Smaller than 90%
of them
Typical length
2 months
In Wales
85 awards

S R Building Solutions Limited ranks 358th of 905 firms for interior fit-out and office reconfiguration awards since 2021.

RankFirmAwardsValue
1Locked33£67.9m
2Locked20£2.15m
3Locked19£4.72m
3Locked19£2.64m
5Locked17£2.78m
6Locked16£140.1m
358S R Building Solutions Limited Won this one1£32,045
See who wins this work

Figures to 21 November 2026

Interior fit-out and office reconfiguration at other buyers

Powys Teaching Local Health Board has awarded 11 contracts since 2021.

  • S R Building Solutions Limited has won 3 public contracts since 2021.

9 interior fit-out and office reconfiguration tenders are open now

See them
More interior fit-out and office reconfiguration contracts awarded in 2026