Railcard validation for Rail Settlement Plan installed by FS Group
- Rail Settlement Plan Limited.
- London
- Direct
- 14 May 2026 to 29 September 2026
Rail Settlement Plan Limited hired FS Group Advisory Limited to install and pilot a central system for checking railcards. The firm hosted the central ticketing information system that ticket issuing systems run on, and the pilot linked the new solution to it.
Rail Settlement Plan awarded the £503,270 contract directly. It was due to end in September 2026, though the buyer could extend it to September 2028.
- What
- Public transport ticketing and concessionary travel
- Supplier
- FS Group Advisory Limited
- Value
- £503,270
- How it was bought
- Direct
- Dates and next
- May 2026 to Sep 2026
- Option to Sep 2028