Contract awardedSolar PV and battery storage
Solar PV for three Windsor and Maidenhead schools goes to Powercor
- Royal Borough of Windsor and Maidenhead
- South East
- Below threshold - without competition
- 1 September 2026 to 31 March 2027
Powercor Ltd is fitting solar photovoltaic (PV) arrays at three schools for the Royal Borough of Windsor and Maidenhead. The three schools are not named.
The borough awarded the £213,563 contract directly to Powercor, without a competition. The work began in September 2026 and the seven-month contract is due to end in March 2027.
Alert me to similar tenders
Contract ends March 2027
- What
- Solar PV and battery storage
- Supplier
- Powercor Ltd
- Value
- £213,563
- How it was bought
- Below threshold - without competition
- Dates and next
- Sep 2026 to Mar 2027