Contract awardedEV chargepoint installation and maintenance

Facility Management UK installs TFL Rapid chargepoint at Cranbrook Road

The London Borough of Redbridge hired Facility Management UK Ltd. to install a TFL Rapid chargepoint at Cranbrook Road Car Park. The order covers a single rapid charger for electric vehicles.

The council asked for quotations before choosing the firm. The contract is estimated at £36,000 and is due to end in June 2028, with an option to extend it to June 2030.

Alert me to similar tenders

Contract ends June 2028

What
EV chargepoint installation and maintenance
Value
£36,000
How it was bought
RFQ
Dates and next
Jul 2026 to Jun 2028
Option to Jun 2030

How it was bought

1 official notice
  1. 9 Jul 2026Award noticeProContract
  2. 9 Jul 2026Contract starts
  3. 25 Jun 2028Contract endsUp to Jun 2030 with extension

London Borough of Redbridge has bought this twice since 2021

Last bought
Jul 2026
Typical length
3 years
Suppliers used
2
AwardedContractWon byValue
Jul 2026This purchase2 yearsFacility Management UK Ltd.£36,000
Jan 2024Locked4 yearsLocked·

Suppliers London Borough of Redbridge has used

SupplierContractsValue
Facility Management UK Ltd. Won this one1£36,000
Locked1·
See the contracts and who won them

Figures to 25 November 2026

How it compares

With every EV chargepoint installation and maintenance award since 2021

Half of awards fall between £44,263 and £325,459Median £100,000

Awards
414
Firms that won them
192
Median award
£100,000
of 368 with a value
This award
Smaller than 79%
of them
Typical length
2 years
In London
30 awards

Facility Management UK Ltd. ranks 68th of 192 firms for EV chargepoint installation and maintenance awards since 2021.

RankFirmAwardsValue
1Locked53£55.9m
2Locked29£5.66m
3Locked19£3.52m
4Locked18£8.46m
5Locked17£2.89m
6Locked15£1.38m
68Facility Management UK Ltd. Won this one1·
See who wins this work

EV chargepoint installation and maintenance at other buyers

London Borough of Redbridge has awarded 448 contracts since 2021.

See London Borough of Redbridge's page
  • Facility Management UK Ltd. has won 3 public contracts since 2021.

3 EV chargepoint installation and maintenance tenders are open now

See them
More EV chargepoint installation and maintenance contracts awarded in 2026