Useful Simple reviews the Ilford Arrival river wall inspection report
- London Borough of Redbridge
- London
- RFQ
- 24 April 2026 to 24 August 2026
London Borough of Redbridge hired Useful Simple Group to check another firm's work on the River Roding river walls. The job was to review the documents and report XEIAD produced after its visual inspection of the walls, under the council's Ilford Arrival work.
The council chose Useful Simple after a request for quotes. The £5,760 contract started in April 2026 and was due to end in August 2026.
- What
- Bridge and structures inspection, assessment and design
- Supplier
- Useful Simple Group
- Value
- £5,760
- How it was bought
- RFQ
- Dates and next
- Apr 2026 to Aug 2026