Contract awardedBridge and structures inspection, assessment and design
River Roding wall survey for Redbridge's Ilford Arrival, done by XEIAD
- London Borough of Redbridge
- London
- RFQ
- 24 April 2026 to 24 August 2026
London Borough of Redbridge paid XEIAD to survey the walls of the River Roding and write up a report on them. The survey came under the council's Ilford Arrival work.
The council chose XEIAD after a request for quotes. The £7,544 contract started in April 2026 and was due to end in August 2026.
- What
- Bridge and structures inspection, assessment and design
- Supplier
- XEIAD
- Value
- £7,544
- How it was bought
- RFQ
- Dates and next
- Apr 2026 to Aug 2026